Go to menu Go to content

Royal Atlantis Resort & Residences – Case Study

News 8 June 2021

The Palm, Jumeria | Dubaï | United Arab Emirates

Project Group

Lead Engineer: Dynamic Engineering Consultants

Design: WSP Middle East

Project Manager: Faithful & Gold

General Contractor: SBJ (Ssangyong, Besix Jv)

Sub-Contractor: Al Shirawi Contracting

Application: Sub-structure waterproofing

SOPREMA Representative: Raymond George

SOPREMA System

COLPHENE BSW

Quantity: 250 000 m²

Year of construction: 2016

Why Was This Project So Impressive?

A $1.4 billion, 46 storey resort consisting of 791 guest rooms and suites and 230 luxury residences. It includes restaurants, retail and entertainment as well as a swimming pool 90 meters above the ground. The project is located on the crescent of the palm and adjacent to the existing Atlantis.

Structural Particulars

SOPREMA worked to customize all previously issued and approved details in accordance with its COLPHENE BSW system. This included tying in pre-applied COLPHENE BSW with the post-applied COLPHENE TORCH’N STICK issue Method Statement for this project, which included different levels of elevations, construction joints and expansion joints, all to match with the construction schedule.

Contact your representative

You have questions about our products, systems or services?

Talk with your Sales Rep